快捷搜索:  as  test  创意文化园  1899  1834  1870  1879  1922

皇冠足球app(www.hg108.vip)_Mudajaya poised for growth

皇冠足球appwww.hg108.vip)是一个开放皇冠即时比分、代理最新登录线路、会员最新登录线路、皇冠代理APP下载、皇冠会员APP下载、皇冠线路APP下载、皇冠电脑版下载、皇冠手机版下载的皇冠新现金网平台。皇冠官网平台上登录线路最新、新2皇冠网址更新最快,皇冠体育APP开放皇冠会员注册、皇冠代理开户等业务。

,Group managing director and chief executive officer James Wong Tet Foh said: “It has been a tough two years but we have managed to return to profitability with our strategic thrust towards renewable energy, tighter controls on overhead spending, as well as the initiatives we have undertaken to reduce debt and improve working capital.”

PETALING JAYA: Mudajaya Group Bhd, which recently returned to the black, is poised for growth, especially in its power segment which had bolstered the group’s profit.

In a statement following its AGM yesterday, group managing director and chief executive officer James Wong Tet Foh said: “It has been a tough two years but we have managed to return to profitability with our strategic thrust towards renewable energy, tighter controls on overhead spending, as well as the initiatives we have undertaken to reduce debt and improve working capital.”

According to the statement, one of the key challenges faced by the group, besides the disruption arising from the pandemic, was the shortage of workers.

In an interview with StarBiz, Wong said: “We are fortunate that we still have the foreign workers with us during the pandemic. However, we lost more as their term expired.”

The group had taken various measures to address this issue including securing alternative sources for workers, revising the sequence of works and increasing resources, while also obtaining the necessary extension of time from its clients.

In addition, Wong said the group had recently received a new permit to bring foreign workers into the country.

With these measures, the group expects its current projects to be completed within the allotted contract periods.

On the hike in minimum wages, Wong said: “We were also conscious of the increment in minimum wage coming into play,” adding that the same applies to the increase in raw material costs.

Mudajaya was also allowed to renegotiate its contracts last year, including for the Light Rail Transit 3 (LRT3) project.

Currently, LRT3 is under construction with 70% progress and is expected to be completed by the end of this year, according to Wong.

On the country’s translation to renewable energy progress, Wong said: “While it is good to have renewables, we have not reached the state of stability. However, we are gradually translating to renewables.”

Mudajaya returned to black in its financial year 2021, posting a net profit of RM8.1mil.

In the first quarter ended March 31, 2022 (1Q22), the group posted a net profit RM2.4mil compared to a net loss of RM2.3mil in the same period a year ago.

The net profit for the quarter in review was mostly bolstered by its power segment that recorded a profit after tax of RM4.5mil.

“The group’s financial result is underpinned by earnings from the power sector, as it gives a stability to the earnings,” Wong said, adding that it takes away the fluctuations in the construction sector.

发表评论
sunbet声明:该文看法仅代表作者自己,与本平台无关。请自觉遵守互联网相关的政策法规,严禁发布色情、暴力、反动的言论。
评价:
表情:
用户名: 验证码:点击我更换图片

您可能还会对下面的文章感兴趣: